The installation and debugging of Distribution Cabinet is a crucial link in the construction of power system, and its accuracy and safety are directly related to the stable operation of the power system. During the installation and commissioning process, relevant regulations and standards must be strictly followed to ensure that every step of the operation is accurate.
When installing Distribution Cabinet, first, you need to choose a suitable installation location. This needs to be comprehensively considered based on the construction drawings and the actual construction site, so as to meet actual needs and not affect the appearance as much as possible. After the installation location is determined, the installation height of the Distribution Cabinet needs to be determined according to the specifications and installed securely. Generally speaking, the height of the bottom edge of the Distribution Cabinet is 1.4 meters from the ground, but it should be adjusted appropriately according to the convenience of actual operation and maintenance. In addition, the installation of the Distribution Cabinet must be straight and firm, the level deviation cannot be too large, and the connection between the inlet and outlet pipes and the Distribution Cabinet must also be tight, strong, delicate, and beautiful.
During the installation process, special attention needs to be paid to grounding protection. Proper grounding is key to ensuring safe system operation. The metal shell and other metal parts of the Distribution Cabinet must be effectively grounded. At the same time, all major equipment, such as transformers and generator sets, must also be properly grounded. This ensures personal safety and the stability of equipment operation.
Before debugging, it is necessary to conduct a comprehensive inspection of the Distribution Cabinet to confirm that all electrical equipment is functioning normally and is not damaged, loose, or aging. At the same time, you should also check the power line to confirm that the wiring is correct, the insulation is good, and the grounding is reliable. After preparing the tools and equipment required for debugging, debug according to the prescribed process and do not change parameters at will to avoid safety accidents. During the debugging process, it is necessary to carefully check the electrical equipment and power lines, conduct interface tests on the unit board and the main control board, and perform voltage withstand tests on the output circuit to ensure that the equipment is operating normally.
To sum up, the installation and debugging of Distribution Cabinet is a job that requires rigorous operation and rich experience. Only by ensuring that every step is correct can the safe and stable operation of the power system be guaranteed.